What are the precautions for stainless steel sink installation?
1、 Before installation
First open the package, take out the tank body and drainage components, and check whether the water tank accessories are complete. Then open the hole according to the opening method described above, and check whether the muffler block is degummed. If degumming, it should be pasted in time. Check whether the sealing rings on both sides of the connecting pipe are missing, misplaced and damaged to avoid leakage after installation.
2、 During installation
When installing the angle valve, in order to prevent accidental damage to the surface of the faucet, it is recommended to put the angle valve on the plastic bag before operation. When connecting the hot and cold water pipes, the left end is connected with the hot water pipe, and the right end is connected with the cold water pipe. In the process of installation, attention should be paid to the size of tightening force. If the force is too large, it is easy to damage the thread, resulting in screw loosening, and if it is too small, it may cause water leakage due to insufficient sealing. Therefore, after the installation of the water tank, it is necessary to carefully check the sealing of the overflow hole and filter basket.
3、 After installation
Remember to test the water after the installation of the sink. First, open the water seal cover of the downer, then raise the drain hose to keep consistent with the mouth of the sink, and then fill the tank with water to ensure that the drain pipe is also full of water. Wait for about 3-5 minutes to check whether there is water leakage at each connection. If water seepage is found, rework and re glue immediately.
Contact : shirley
Tel : +86-0750-8662208
Mobile : 13632053213
Fax : +86-0750-8662208
Email : shirley@yuantu-faucet.com
Address : #4 Taixin Road, Area B,DongXi lndustrial Zone,Zhishan Town,Heshan City,Guangdong,China