YUANTU Pull out kitchen mixer Modle:YT-1-1074H
Installation, maintenance and maintenance of faucet
Ask the electrician to install and ensure the correct installation
Please have experienced and qualified professionals for installation.
1. First, thoroughly wash the sediment, hemp and dirt in the water inlet pipe for many times.
2. The faucet and the hot and cold water supply pipe must be connected correctly. Facing the faucet, connect hot water on the left and cold water on the right.
3. During installation, the force must be balanced, and the appropriate wrench should be selected. Do not use too much force to install or damage components.
4. The standard of successful installation is: no water leakage; no trace.
Note: the faucet should not collide and rub with hard objects, and cement and glue should not be left on the surface of the faucet.
Contact : shirley
Tel : +86-0750-8662208
Mobile : 13632053213
Fax : +86-0750-8662208
Email : shirley@yuantu-faucet.com
Address : #4 Taixin Road, Area B,DongXi lndustrial Zone,Zhishan Town,Heshan City,Guangdong,China